Home › Bathroom Remodeling
Bathroom Remodeling in Wichita, KS
From a hall bath refresh to a full primary-bath renovation. Describe the room and what you want changed, and request a free estimate.
- Free, no-obligation estimate requests
- Bathrooms, kitchens, basements and whole-home updates
- Wichita and nearby towns in Sedgwick and Butler counties
Free remodeling estimate
About a minute. Send the details and expect a call back to talk the project through.
Partial update or full remodel?
A bathroom project usually lands in one of three sizes:
- Cosmetic refresh: new vanity, top, faucet, mirror, lighting, paint and maybe flooring, with the tub or shower and the plumbing left where they are.
- Full remodel in the same footprint: everything comes out to the studs, then new tile, a new tub or shower, fixtures, ventilation and finishes go back in the same layout.
- Layout change: moving the toilet, enlarging the shower, adding a second sink or borrowing space from a closet. Moving drains and walls is where scope grows.
Things worth deciding early
- Tub or shower. Many Wichita homes have one tub-shower combo in the hall bath. If it is the only tub in the house, think about whether you will want one later, for small kids or for resale. See showers and tub-to-shower conversions.
- Ventilation. A properly sized exhaust fan, ducted outdoors, protects paint, grout and framing from moisture.
- Waterproofing behind tile. Tile and grout are not waterproof by themselves. Ask how the shower walls and floor will be waterproofed.
- Accessibility. Blocking in the walls for grab bars costs little while the walls are open. See aging-in-place bathrooms.
Older homes
In a house built before 1978, work that disturbs painted surfaces falls under the EPA Renovation, Repair and Painting (RRP) rule for lead-safe work practices. Older bathrooms can also hide galvanized supply lines, cast-iron drains or past water damage that only shows up during demolition. Those are good questions to raise when someone looks at the room. Read remodeling an older Wichita home.
Permits
In Wichita and unincorporated Sedgwick County, building, plumbing and electrical permits are handled by the Metropolitan Area Building and Construction Department (MABCD). Suburban cities may have their own building office. Whether a bathroom job needs a permit depends on the work, so ask about it when you get an estimate.
Questions about bathroom remodels
How long does a bathroom remodel take?
It depends on the scope, material lead times and inspections. A cosmetic refresh is much shorter than a full gut remodel or a layout change. Ask for a schedule with your estimate rather than relying on a general number.
Can I keep my existing tub?
Often, yes. A cast-iron tub in good shape can stay while the surround, fixtures and finishes are replaced. Mention it in the form.
Do you list bathroom remodel prices?
No. Price depends on size, layout changes, materials and what is found behind the walls. The estimate is where real numbers come from.
Planning a remodel in the Wichita area?
Tell us what you want changed, where the house is and roughly when. It takes about a minute, and there is no obligation.
Other remodeling projects
Shower Remodels & Tub-to-Shower Conversions
Replace a shower, convert a tub to a walk-in shower, or rebuild a leaking stall.
Kitchen Remodeling
Cabinets, counters, layout changes, lighting and opening walls.
Basement Finishing & Remodeling
Turn an unfinished or dated basement into living space.
Whole-Home Remodeling & Renovation
Multi-room projects, layout changes and full renovations.
Aging-in-Place & Accessible Bathrooms
Low-threshold showers, grab-bar blocking, comfort-height fixtures and wider doors.
Choosing a Remodeling Contractor
What to ask and compare before you hire anyone for a remodel.